search
menuicon
thubnail
마녀의 마법
順序解釋
1
System Development
Heni Sulistian
其他
資訊通信技術 (ICT)
新增的問題 (20/ 20)
允許錯誤答案,隱藏答案
public quiz
問題 1
選擇型

What does SDLC stand for?

Software Development Life Cycle
Systems Development Life Cycle
Systematic Development Life Cycle
Structured Development Life Cycle
問題 2
選擇型

What is the first phase of the SDLC?

Development
Testing
Planning
Implementation
問題 3
選擇型

Which model is known for its step-by-step approach?

Agile Model
Waterfall Model
Incremental Model
Hybrid Model
問題 4
選擇型

What is a key benefit of using Agile methodologies?

Fixed requirements
Longer development cycles
Less user involvement
Flexibility and adaptability
問題 5
選擇型

What does the V-Model emphasize?

Cost management
Rapid delivery
Verification and validation
User training
問題 6
選擇型

What is a disadvantage of traditional SDLC models?

High flexibility
Easy to manage
Rigid structure
Low costs
問題 7
選擇型

Which phase involves gathering requirements?

Systems Analysis
System Design
Development
Maintenance
問題 8
選擇型

What is the purpose of testing in SDLC?

To gather requirements
To train users
To design the system
To identify and fix defects
問題 9
選擇型

What is a key feature of the Incremental Model?

Complete deployment at once
Development in small increments
No user feedback
Fixed requirements
問題 10
選擇型

What is involved in the maintenance phase?

Initial planning
User training
Updating and fixing issues
Requirements gathering
問題 11
選擇型

What does a hybrid model combine?

Only traditional methods
Only Agile methods
Documentation and testing
Agile and traditional methodologies
問題 12
選擇型

What is a challenge in systems development?

Resource constraints
Easy requirement changes
Abundant skilled resources
Simple stakeholder alignment
問題 13
選擇型

What is the goal of resource management in SDLC?

Increase costs
Ensure proper resource utilization
Limit team collaboration
Avoid documentation
問題 14
選擇型

What does continuous improvement in SDLC focus on?

Reducing costs only
Maintaining the status quo
Optimizing processes and tools
Ignoring user feedback
問題 15
選擇型

What is a common tool used for system design?

Microsoft Word
Microsoft Excel
Microsoft PowerPoint
Microsoft Visio
問題 16
選擇型

What is the main purpose of stakeholder involvement?

To limit communication
To avoid project delays
To ensure user needs are met
To increase costs
問題 17
選擇型

Which methodology uses short development cycles?

Scrum
Waterfall
V-Model
Incremental
問題 18
選擇型

What is a key aspect of the planning phase?

Coding the system
Defining project scope
Testing the system
Gathering user feedback
問題 19
選擇型

What does the term "cost-effective" refer to in SDLC?

High spending
Limited project scope
Increased project duration
Efficient use of resources
問題 20
選擇型

What is a significant advantage of using SDLC?

Decreased quality assurance
Better risk management
More complex processes
Less user involvement